Home/ TX/ McKinney/ BTF EV POWER LINK 2
ChargePoint Network McKinney, TX

BTF EV POWER LINK 2

950 South Central Expressway

2
ports
150 kW
max power
CCS
connectors
Specs

The details.

Total Ports2
Max Power150 kW
ConnectorsCCS
AccessMon: 8:00am-8:00pm; Tue: 8:00am-8:00pm; Wed: 8:00am-8:00pm; Thu: 8:00am-8:00pm; Fri: 8:00am-8:00pm; Sat: 8:00am-8:00pm
Address950 South Central Expressway
McKinney, TX 75072
Coordinates33.189527, -96.640469
Directions Google Maps Apple Maps
Data

Source & verification.

Station data sourced from NREL AFDC API (ID #395648). Refreshed nightly. Field intelligence verified by The Juice Index editors. Sustainability scoring methodology documented at /about/methodology/.

AFDC ID: 395648