Home/ GA/ College Park/ HJAIA LEVEL3 STATION1
ChargePoint Network College Park, GA

HJAIA LEVEL3 STATION1

4199 Skytrain Way

2
ports
19.2 kW
max power
J1772
connectors
Specs

The details.

Total Ports2
Max Power19.2 kW
ConnectorsJ1772
Access24 hours daily
Address4199 Skytrain Way
College Park, GA 30337
Coordinates33.641868, -84.459179
Directions Google Maps Apple Maps
Data

Source & verification.

Station data sourced from NREL AFDC API (ID #181171). Refreshed nightly. Field intelligence verified by The Juice Index editors. Sustainability scoring methodology documented at /about/methodology/.

AFDC ID: 181171