Home/ AZ/ Gilbert/ THE TYLER ADA PAR. SPOT 2
ChargePoint Network Gilbert, AZ

THE TYLER ADA PAR. SPOT 2

3150 E Ray Rd

1
ports
19.2 kW
max power
J1772
connectors
Specs

The details.

Total Ports1
Max Power19.2 kW
ConnectorsJ1772
AccessMon: 12:00am-11:59pm; Tue: 12:00am-11:59pm; Wed: 12:00am-11:59pm; Thu: 12:00am-11:59pm; Fri: 12:00am-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm
Address3150 E Ray Rd
Gilbert, AZ 85296
Coordinates33.322152, -111.72414
Directions Google Maps Apple Maps
Data

Source & verification.

Station data sourced from NREL AFDC API (ID #233433). Refreshed nightly. Field intelligence verified by The Juice Index editors. Sustainability scoring methodology documented at /about/methodology/.

AFDC ID: 233433