25
Sites tracked
25
Live
0
Under construction
96
Planned ports

Wisconsin's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.

New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.

Wisconsin Sites

Location Corridor Operator Ports Power Status Expected Live Source
Ashland KWIK_CHARGE 4 250 kW live † 2024-12-12 Source →
Baraboo KWIK_CHARGE 4 250 kW live † 2025-11-27 Source →
Brule FCN 4 150 kW live † 2025-10-21 Source →
Cameron KWIK_CHARGE 4 250 kW live † 2026-04-03 Source →
Chippewa Falls KWIK_CHARGE 4 250 kW live † 2024-12-12 Source →
Crandon RED_E 4 150 kW live † 2026-02-10 Source →
Crivitz KWIK_CHARGE 4 250 kW live † 2026-07-17 Source →
Fond Du Lac KWIK_CHARGE 4 250 kW live † 2025-12-31 Source →
Hixton KWIK_CHARGE 4 250 kW live † 2026-04-03 Source →
La Crosse KWIK_CHARGE 4 250 kW live † 2025-08-15 Source →
Ladysmith FCN 4 150 kW live † 2025-08-08 Source →
Marinette KWIK_CHARGE 4 250 kW live † 2026-04-03 Source →
Menomonie KWIK_CHARGE 4 250 kW live † 2024-12-11 Source →
Milwaukee FCN 4 150 kW live † 2026-07-03 Source →
Mt. Horeb KWIK_CHARGE 4 250 kW live † 2025-05-09 Source →
Pewaukee KWIK_CHARGE 4 250 kW live † 2025-12-31 Source →
Pleasant Prairie KWIK_CHARGE 4 250 kW live † 2025-11-07 Source →
Plover KWIK_CHARGE 4 250 kW live † 2026-04-03 Source →
Rhinelander ChargePoint Network 2 250 kW live † 2025-09-25 Source →
Rhinelander ChargePoint Network 2 250 kW live † 2025-09-25 Source →
Richfield KWIK_CHARGE 4 250 kW live † 2026-04-03 Source →
Sheboygan FCN 4 150 kW live † 2025-08-08 Source →
St. Croix Falls KWIK_CHARGE 4 250 kW live † 2026-07-17 Source →
Wausau KWIK_CHARGE 4 250 kW live † 2026-07-17 Source →
Wausaukee FCN 4 150 kW live † 2025-08-08 Source →

Data sources and methodology

Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: Wisconsin EV charging hub · Q3 2026 regional status report.

= station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.