9
Sites tracked
9
Live
0
Under construction
46
Planned ports

New Mexico's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.

New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.

New Mexico Sites

Location Corridor Operator Ports Power Status Expected Live Source
Albuquerque RED_E 4 150 kW live † 2026-05-02 Source →
Deming ELECTRIC_ERA 4 150 kW live † 2025-01-23 Source →
Jamestown eVgo Network 4 150 kW live † 2025-04-01 Source →
Lordsburg Tesla 12 250 kW live † 2025-03-24 Source →
Los Lunas FCN 4 150 kW live † 2025-08-28 Source →
Moriarty eVgo Network 4 150 kW live † 2025-06-21 Source →
Santa Rosa Tesla 6 250 kW live † 2015-03-12 Source →
Socorro FCN 4 150 kW live † 2025-05-03 Source →
Truth or Consequences FCN 4 150 kW live † 2025-07-16 Source →

Data sources and methodology

Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: New Mexico EV charging hub · Q3 2026 regional status report.

= station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.