NEVI Build-Out New Mexico
New Mexico NEVI Build-Out
Every NEVI-funded charging site in New Mexico, from grant award to first charge. Part of the regional NEVI tracker.
New Mexico's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.
New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.
New Mexico Sites
| Location | Corridor | Operator | Ports | Power | Status | Expected Live | Source |
|---|---|---|---|---|---|---|---|
| Albuquerque | — | RED_E | 4 | 150 kW | live † | 2026-05-02 | Source → |
| Deming | — | ELECTRIC_ERA | 4 | 150 kW | live † | 2025-01-23 | Source → |
| Jamestown | — | eVgo Network | 4 | 150 kW | live † | 2025-04-01 | Source → |
| Lordsburg | — | Tesla | 12 | 250 kW | live † | 2025-03-24 | Source → |
| Los Lunas | — | FCN | 4 | 150 kW | live † | 2025-08-28 | Source → |
| Moriarty | — | eVgo Network | 4 | 150 kW | live † | 2025-06-21 | Source → |
| Santa Rosa | — | Tesla | 6 | 250 kW | live † | 2015-03-12 | Source → |
| Socorro | — | FCN | 4 | 150 kW | live † | 2025-05-03 | Source → |
| Truth or Consequences | — | FCN | 4 | 150 kW | live † | 2025-07-16 | Source → |
Data sources and methodology
Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: New Mexico EV charging hub · Q3 2026 regional status report.
† = station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.