NEVI Build-Out Kentucky
Kentucky NEVI Build-Out
Every NEVI-funded charging site in Kentucky, from grant award to first charge. Part of the regional NEVI tracker.
Kentucky's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.
New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.
Kentucky Sites
| Location | Corridor | Operator | Ports | Power | Status | Expected Live | Source |
|---|---|---|---|---|---|---|---|
| Berea | — | CIRCLE_K | 4 | 250 kW | live † | 2025-01-06 | Source → |
| Bowling Green | — | FCN | 4 | 250 kW | live † | 2026-05-12 | Source → |
| Campton | — | FCN | 4 | 250 kW | live † | 2026-04-11 | Source → |
| Central City | — | FCN | 4 | 250 kW | live † | 2026-05-22 | Source → |
| Elizabethtown | — | ChargePoint Network | 2 | 250 kW | live † | 2026-04-24 | Source → |
| Elizabethtown | — | ChargePoint Network | 2 | 250 kW | live † | 2026-04-24 | Source → |
| Glasgow | — | FCN | 4 | 250 kW | live † | 2026-03-14 | Source → |
| Grayson | — | ChargePoint Network | 2 | 250 kW | live † | 2025-06-27 | Source → |
| Grayson | — | ChargePoint Network | 2 | 250 kW | live † | 2025-06-27 | Source → |
| Hazard | — | ELECTRIC_ERA | 4 | 150 kW | live † | 2025-04-30 | Source → |
| Horse Cave | — | ChargePoint Network | 2 | 250 kW | live † | 2026-06-26 | Source → |
| Manchester | — | POWERUP | 4 | 250 kW | live † | 2026-06-26 | Source → |
| Mayfield | — | FCN | 4 | 250 kW | live † | 2026-07-18 | Source → |
| Morehead | — | FCN | 4 | 250 kW | live † | 2026-04-11 | Source → |
| Nortonville | — | FCN | 4 | 250 kW | live † | 2026-06-24 | Source → |
| Paducah | — | eVgo Network | 4 | 150 kW | live † | 2026-04-14 | Source → |
| Richmond | — | CIRCLE_K | 4 | 150 kW | live † | 2024-09-17 | Source → |
| Salyersville | — | FCN | 4 | 250 kW | live † | 2026-05-22 | Source → |
| Shepherdsville | — | ChargePoint Network | 2 | 250 kW | live † | 2026-05-28 | Source → |
| Shepherdsville | — | ChargePoint Network | 2 | 250 kW | live † | 2026-05-28 | Source → |
| Sparta | — | ChargePoint Network | 2 | 250 kW | live † | 2025-08-08 | Source → |
| Sparta | — | ChargePoint Network | 2 | 250 kW | live † | 2025-08-08 | Source → |
Data sources and methodology
Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: Kentucky EV charging hub · Q3 2026 regional status report.
† = station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.