NEVI Build-Out Kentucky

Kentucky NEVI Build-Out

Every NEVI-funded charging site in Kentucky, from grant award to first charge. Part of the regional NEVI tracker.

21
Sites tracked
21
Live
0
Under construction
66
Planned ports

Kentucky's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.

New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.

Kentucky Sites

Location Corridor Operator Ports Power Status Expected Live Source
Berea — CIRCLE_K 4 250 kW live † 2025-04-03 Source →
Bowling Green — FCN 4 250 kW live † 2026-05-12 Source →
Campton — FCN 4 250 kW live † 2026-04-11 Source →
Central City — FCN 4 250 kW live † 2026-05-22 Source →
Elizabethtown — ChargePoint Network 2 250 kW live † 2026-04-24 Source →
Elizabethtown — ChargePoint Network 2 250 kW live † 2026-04-24 Source →
Glasgow — FCN 4 250 kW live † 2026-03-14 Source →
Grayson — ChargePoint Network 2 250 kW live † 2025-06-27 Source →
Grayson — ChargePoint Network 2 250 kW live † 2025-06-27 Source →
Hazard — ELECTRIC_ERA 4 150 kW live † 2025-04-30 Source →
Horse Cave — ChargePoint Network 2 250 kW live † 2026-06-26 Source →
Mayfield — FCN 4 250 kW live † 2026-07-18 Source →
Morehead — FCN 4 250 kW live † 2026-04-11 Source →
Nortonville — FCN 4 250 kW live † 2026-06-24 Source →
Paducah — eVgo Network 4 150 kW live † 2026-04-14 Source →
Richmond — CIRCLE_K 4 150 kW live † 2024-09-17 Source →
Salyersville — FCN 4 250 kW live † 2026-05-22 Source →
Shepherdsville — ChargePoint Network 2 250 kW live † 2026-05-28 Source →
Shepherdsville — ChargePoint Network 2 250 kW live † 2026-05-28 Source →
Sparta — ChargePoint Network 2 250 kW live † 2025-08-08 Source →
Sparta — ChargePoint Network 2 250 kW live † 2025-08-08 Source →

Data sources and methodology

Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: November 2026. For scoring methodology across the site, see how we measure. Related: Kentucky EV charging hub · Q3 2026 regional status report.

† = station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.